From 10:00 a.m. to 11:30 a.m. on August 15, 2022, Chengxin, as one of the "most powerful suppliers", had the honor to participate in the online sharing meeting of Siemens SXVT.
Chengxin and the participating suppliers shared how to update production plans, increase material preparation, strengthen quality control, adjust working hours and other methods to deal with sudden changes in the difficult epidemic period. Especially on April 16, affected by the epidemic, the whole area of Heqiao Town in Yixing, as the control area, pressed the "pause button" in a flash. During this period, the Chengxin team actively responded to the call of the local party and government. All the staff stayed at home for two weeks and stayed away from their posts. They kept active communication with customers through telephone and internet, and actively signed up to participate in the volunteer service team for epidemic prevention and fighting. On April 26, Chengxin made full preparations and became the first batch of local enterprises to resume production while the control was still in progress.
Obtaining the "most powerful supplier" of SXVT is not only a recognition of the work achievements of Chengxin team, but also the pressure and motivation for us to keep moving forward and climb the peak. It is believed that as long as the Chengxin team works together to overcome difficulties and keep forging ahead, we will certainly realize our vision of "becoming a professional solution company in the field of radiation protection with first-class design, manufacturing, construction and service".
Contact Person: Mr. Joseph
Tel: 15961556190
Fax: 86-510-8781-6996